All three stages of the Norochcholai Power Plant came to a stanstill last evening, reports said.
Accordingly, the first two Stages were undergoing repairs when the third Stage also came to a halt.
Each Stage produces 300 MW, bringing the full capacity to 900 MW.
Reports said that the Power Station is expected be back in operation by Sunday morning.